EAC (EAC)
Also known as: EAC full form · Central EAC · Expert Appraisal Committee EIA
The Expert Appraisal Committee (EAC) is the central technical committee under MoEFCC that reviews EIA reports for Category A industrial projects and recommends Environmental Clearance conditions.
Last updated
Beyond definitions
Planning to start a business in any of these sectors?
Get the full business understanding — capex, regulations, machinery, vendor questions, and risk checks before you commit capital.
What is EAC?
The Expert Appraisal Committee (EAC) is the central technical committee constituted by MoEFCC under the EIA Notification 2006 that scrutinises Environmental Impact Assessment reports for Category A industrial projects and recommends Environmental Clearance (EC) conditions to the ministry. The EAC is sector-specialised — separate committees exist for thermal power, mining, industry, infrastructure, river valley projects, building and construction, and CRZ projects — with each committee comprising 10–15 subject-matter experts drawn from academia, retired senior bureaucrats, and technical institutions.
For CBG, recycling, and pyrolysis projects falling in Category A, the relevant EAC is typically EAC-Industry or EAC-Infrastructure, depending on plant capacity and waste stream classification. The Category A threshold for biogas and WtE is roughly above 50 TPD capacity or 5 MW power equivalent; large pyrolysis facilities above 50 TPD plastic input also fall here. EAC examines the EIA report submitted by the project developer (typically 300–600 pages) against the project's site-specific Terms of Reference, raises clarifications and additional information requests, and makes its recommendation after considering presentations by the developer and consultant.
The EAC process is meticulous and time-bound. Meetings happen monthly, with each project getting 30–60 minutes of committee time. Common recommendation outcomes are: clearance with specific conditions, deferral pending additional information or studies, or rejection with reasons. Conditions imposed typically cover air emission norms tighter than baseline (e.g. PM at 30 mg/Nm³ rather than 50 mg/Nm³), groundwater monitoring frequency, biodiversity offset commitments, and Corporate Environmental Responsibility (CER) fund earmarking at 0.5–2% of project capex for community welfare. EAC recommendations are advisory; MoEFCC takes the final decision, though deviations from EAC views are uncommon. For developers, presenting at EAC requires preparation depth — the committee identifies technical inconsistencies and benchmark deviations sharply, and unprepared presentations result in 6–12 month deferrals.
- Central technical committee under MoEFCC for Category A EIA appraisal.
- Sector-specialised: Industry, Infrastructure, Thermal Power, Mining, River Valley.
- 10–15 subject-matter experts; meets monthly with 30–60 minutes per project.
- Recommendations: clearance with conditions, deferral, or rejection — final decision by MoEFCC.
Common questions about EAC
Plain-English answers to what people most often ask.
What is the full form of EAC?
What is the difference between EAC and SEAC?
Want the full picture, not just the term?
Adhāra Viveka gives you structured clarity on capital-intensive recycling and renewable-energy sectors — before you commit money or engage vendors.